Call Us for a Quote: 250.374.4646

2853 Bowers Place, Kamloops, British Columbia V1S 1W5

watch us on youtubelike us on facebook

Building NEW GOBOXES - July 31st 2017


Shane and Jamie spent this Saturday building up new GOBOXES. Everyone here at GO BOX Storage is excited about building the new GOBOXES.

Once all the bugs are out of the system, it takes about 30 minutes to assemble a GOBOX. Here's Shane moving a GOBOX to the last part of the assemble line.
Once the bugs are out of the system, it takes about 30 minutes to assemble a GOBOX. Here's Shane moving a GOBOX to the last part of the assembly line.

building-goboxes-2
Each GOBOX gets a once over and a good sanding after assembly. Here's Jamie getting ready to sweep out an assembled GOBOX.

building-goboxes-3
Each GOBOX is checked over, numbered, swept out and cleaned before being stacked in the warehouse.

building-goboxes-4
GOBOXES are engineered to be stacked four high. We only stack three high in the warehouse.

building-goboxes-5
Here's Shane stacking the GOBOX parts for assembly another day.

building-goboxes-6
Here's a brand new GOBOX, all ready to go out to a NEW customer!